Skip links
Premium Residential

REDA ANUGRAHA

2 BHK
TYPE
774 - 918
Sq.Ft
G+3
Floor
Launched
Status
Project

Project Type

Premium Residential Apartment

Location

Sathyamoorthy Street, Lakshman Nagar, Perungudi, Chennai – 600096.

Accommodation

2 Bedroom Units

Total Units

8 Numbers

No. of Floors

Stilt + 3 Floors

Project Status

Launched

Specification
Structure
R.C.C. framed structure with RCC Columns, beams and slabs. Solid Block Masonry filler walls, Stilt plus Three Floors with earthquake resistant design.
JOINERY
MAIN DOOR
Engineered Wooden Door Frame & Shutter or HDF Doors with Teak Wood Frame or Equivalent with Lacquer/ PU finish including good quality hinges, lock, handle and security eye
BED ROOM DOORS
Engineered Wooden Door Frame & Shutter or HDF Doors with Teak Wood Frame or Equivalent with Lacquer/ PU finish including good quality hinges, lock and handle.
TOILET DOORS
Water proofed(inner side) flush Door with hardwood Frame or Equivalent including good quality hinges, handle and thumb turn lock.
BALCONY DOOR
Aluminum/UPVC glazed door-cum-window with sliding or hinged Shutters.
WINDOWS
Heavy gauged, Aluminum/UPVC frames, with glazed, sliding, hinged Shutters with M.S.Grills.
FLOORING
Vitrified Tile Flooring (2 ‘x 2’) from RAK or Equivalent.
KITCHEN
Black Granite slab over cooking platform, Stainless Steel kitchen sink and ceramic tile dado about 2′ 0” height above platform.
TOILETS
Ceramic tile flooring from RAK or Equivalent and glazed tile Dado till 7’0” height, with RAK or Equivalent, Concealed Plumbing Arrangements For All Toilets shall be provided(Finolex or Equivalent PVC pipes for cold water and CPVC pipes for hot water lines)
SANITARYWARES & FIXTURES
White Glazed EWC and white color Wash Basin, C.P. fittings and other suitable fixtures from Jaguar or Equivalent.
WATER SUPPLY
One Sump and Overhead Tank for Metro Water. Taps in the kitchen for Metro water and GroundWater (bore well). Toilets shall have 1 No.wall mixer and a Health faucet.
ELECTRICAL
Three phase electric supply connection with changeover facility and concealed copper wiring from Hovels or Equivalent. All switches from MK / Anchor Roma/Equivalent, Point for telephone & T.V at Living, Fridge, Geyser for toilet, Washing Machine at one point location, Grinder, Fan and Light points. Miniature Circuit Breaker & ELCB (Earth Leak Circuit Breaker) from Hovels or Equivalent.
FINISHING
Internal walls finishing with ICI / Asian / acrylic emulsion over Two coats of cement putty & External walls finishing with weather proof exterior emulsion from ICI/ Asian.
PROVISION OF ELECTRICAL POINTS
ENTRANCE
One Bell Point and One Light Point
DRAWING
One TV Point, One Telephone Point, 2 light points in walls and one chandelier point. One 5 Amps pin point and one Fan point and One 20 Amps point for split A/c Provision.
DINING
One 15 Amps points for fridge, Two light points in wall, One 5 Amps point and One Fan point.
BEDROOMS
2 light points in wall, One 5 Amps point, one 20 Amps point for Split AC, and one Fan point and One Telephone point. Note: All AC points provisions are considered for split AC. Window AC provision will be charged.
KITCHEN
Two light points in wall, Exhaust fan point, one pin point for Mixie, one point for Wet-grinder and 5Ams point for Aqua Guard.
TOILETS
One light point, one 15 Amps point for Geyser, One light point over wash basin mirror and One 5 Amps Exhaust fan point.
COMMON POINTS
Common light points in stairs, Terrace 2 Nos in Parapet walls, points for pump motor etc., all as per Company’s design.
Electrical points required over and above the standard provisions will be provided at extra cost.
Amenities
Stamp Duty
ELECTRICITY
Meter Deposit and Development charges will have to be borne by the Allottee. The fees payable to TNEB will be including incidental expenses towards electrical connection will have to be paid by the Party on Pro-Rata basis.
Water & Drainage
Fees for Metro Water connection, Drainage Connection and incidental expenses have to be borne by the Allottee.
Extra Work
If any additional work is required to be carried out or extra fittings are to be provided, the same will be executed at extra cost after the Allottee approves the estimate for extras and pays the extra cost in Advance.
Payment Schedule
While booking advance
10%
Within one month of booking
15%
On Completion of Foundation
12%
On completion of Ground / Stilt Floor Roof Slabs
12%
On Completion of First Floor Roof Slab
12%
On Completion of Second Floor Roof Slab
12%
On Completion of Third Floor Roof Slab
12%
On Completion of Brick work in Respective Unit
10%
On handing over
5%
Availability
First Floor

101

774sq.ft

Sold
First Floor

102

888sq.ft

Not Sold
First Floor

103

808sq.ft

Sold
Second Floor

201

774sq.ft

Sold
Second Floor

202

888sq.ft

Not Sold
Second Floor

203

808sq.ft

Sold
Third Floor

301

852sq.ft

Not Sold
Third Floor

302

918sq.ft

Not Sold
This website uses cookies to improve your web experience.