Premium Residential
REDA ENCLAVE
- Vallalar Street, Panneer Nagar Part 2, Mugappair, Chennai 600 037.
2 & 3 BHK
TYPE
1297 - 1645
Sq.Ft
G+2
Floor
Sold
Status
Project
Project Type
Premium Residential Apartment
Location
Plot No.167,Vallalar Street, Panneer Nagar Part 2, Mugappair, Chennai 600 037.
Accommodation
2 & 3 Bedroom Units
Total Units
6 Numbers
No. of Floors
Stilt + 2 Floors
Project Status
Sold
Specification
Structure
R.C.C. framed structure with RCC Columns, beams and slabs. Block Masonry filler walls, Stilt plus Two Floors with earth quake resistant design.
Flooring & Finishes
FLOORING
Vitrified Tile Flooring (2 x 2) from RAK or Equivalent.
KITCHEN
Black Granite slab over cooking platform, carysil kitchen sink and ceramic tile dado about 2′-0″ height above platform.
TOILETS
Ceramic tile flooring from RAK or Equalant and tile Dado, For walls with RAK or Equalant Tiles full Height From Floor to False Ceiling, Concealed Plumbing Arrangements For All Toilets (Finolex PVC pipes for cold water and CPVC pipes for hot water lines)
SANITARYWARE & FIXTURES
White Glazed EWC and white colour Wash Basin, C.P. fittings and other suitable fixtures from Jaquar or Equivalent.
WATER SUPPLY
One Sump and Overhead Tank for Metro Water. Taps in the kitchen for Metro water and Ground Water (bore well). Toilets shall have 1 No. concealed Diverter/ wall mixer and a Health faucet.
ELECTRICAL
Three phase electric supply connection with changeover facility and concealed copper wiring from Havels. All switches from MK / Anchor Roma points for telephone, T.V, Fridge, Geyser, Washing Machine, Grinder, Fan and Light points. Miniature Circuit Breaker & ELCB (Earth Leak Circuit Breaker) from Havels
FINISHING
Internal walls finishing with premium ICI / Asian / emulsion over Two coats of cement putty & External walls finishing with weather proof exterior emulsion from ICI Weather shield MAX.
CUPBOARDS
Open Cupboards
LOFTS
Open Lofts in Bedrooms and Kitchen.
PROVISION OF ELECTRICAL POINTS
ENTRANCE
One Bell Point and One Light Point
DRAWING
One TV Point, One Telephone Point, 2 light points in walls and one chandelier point. One 5 Amps pint point and one Fan point and One 20 Amps point for split A/c Provision.
DINING
One 15 Amps points for fridge, Two light points in wall, One 5 Amps pin point and One Fan point.
BEDROOMS
2 light points in wall, One 5Ams pin point, one 20 Amps point for Split AC, and one Fan point and One Telephone point. Note: All AC points are for split AC provisiononly. Window AC provision will be charged.
KITCHEN
Two light points in wall, Exhaust fan point, one pin point for Mixie, one point for Wet-grinder and 5Ams point for Aqua Guard.
TOILETS
One light point, one 15 Amps point for Geyser, One light point over wash basin mirror and one One 5 Amps Exhaust fan point.
SERVICE
One 5 Amps pin point and one light point and 15 Amps point for Washing Machine.
COMMON POINTS
Common light points in stairs, Terrace 2 Nos in Parapet walls, points for pump motor etc., all as per Company’s design.
Amenities
- Security Cabin
- CCTV
- Generator – Power Back Up except A/c
- Deccan Lift
- Beautiful landscaping
- Entrance gates
- Compound walls as per Architect’s Design
- Common area staircase Granite flooring
- Name plates, Letter Box for each flats
- Separate electric meters in the main board
- Separate common electric meter for common service and sub main board (ECB) in each flat for quick isolation of supply
Stamp Duty
- 7% of the value of undivided share of land as stamp duty and 1% of the value of land as registration charges will have to be borne by the Purchaser. Stamp Duty and registration charges will have to be paid based on Seller’s value or the guide line value whichever is higher.
- 1 % OF THE VALUE OF THE CONSTRUCTION Agreement as stamp duty and 1 % as registration charge.
- Legal fees, Documentation charges and incidental charges payable at Registrar Office will have to be borne by the Allottee.
- VAT on works contract as applicable.
- Service Tax 5% on Construction cost.
ELECTRICITY
Meter Deposit and Development charges will have to be borne by the Allottee. The fees payable to TNEB will be including incidental expenses towards electrical connection will have to be paid by the Party on Pro-Rata basis.
Water & Drainage
Fees for Metro Water connection, Drainage Connection and incidental expenses have to be borne by the Allottee.
Extra Work
If any additional work is required to be carried out or extra fittings are to be provided, the same will be executed at extra cost after the Allottee approves the estimate for extras and pays the extra cost in Advance.
Payment Schedule
While booking
20%
On Completion of Foundation
20%
On completion of Ground / Stilt Floor Roof Slabs
20%
On Completion of First Floor Roof Slab
15%
On Completion of Second Floor Roof Slab
15%
On handing over
10%
Availability
First Floor
Unit A
1297sq.ft
Sold
First Floor
Unit B
1645sq.ft
Sold
First Floor
Unit C
1401sq.ft
Sold
Second Floor
Unit A
1297sq.ft
Sold
Second Floor
Unit b
1645sq.ft
Sold
Second Floor
Unit b
1401sq.ft

