RAK ceramic tile flooring & full-height wall dado, concealed plumbing with Finolex PVC/CPVC pipes
Wall Finish
ICI/Asian emulsion over 2 coats cement putty. Exterior: ICI Weather Shield MAX
Cupboards
Open Cupboards
Lofts
Open Lofts in Bedrooms and Kitchen
Services & Fittings
Sanitarywares
White Glazed EWC, Wash Basin, C.P. fittings from Jaquar or Equivalent
Water Supply
Sump & overhead tank for Metro Water. Kitchen taps for Metro & borewell. Toilets: concealed diverter, wall mixer & health faucet.
Electrical
3-phase supply, Havels concealed copper wiring, MK/Anchor Roma switches, MCB & ELCB from Havels
Amenities
Entrance gates
Compound walls as per Architect's Design
Common area staircase Granite flooring
Name plates & Letter Box per flat
Separate electric meters in main board, separate common electric meter & sub main board (ECB) in each flat
Stamp Duty
7% of undivided land share as stamp duty + 1% as registration charges — payable by Purchaser based on Seller's value or guideline value, whichever is higher.
1% of Construction Agreement value as stamp duty + 1% as registration charge.
Legal fees, Documentation and incidental charges at Registrar Office to be borne by Allottee.
VAT on works contract as applicable.
Service Tax 5% on Construction cost.
Flooring & Finishes
RCC framed structure with RCC Columns, beams and slabs. Brick Masonry filler walls, Stilt plus Two Floors with earthquake resistant design.
Water & Drainage
Metro Water connection, Drainage Connection and incidental expenses to be borne by Allottee.
Extra Work
Additional work or fittings executed at extra cost only after Allottee approves the estimate and pays in advance.
Payment Schedule
While booking
20%
On Completion of Foundation
20%
On completion of Ground / Stilt Floor Roof Slabs
20%
On Completion of First Floor Roof Slab
15%
On Completion of Second Floor Roof Slab
15%
On handing over
10%
Availability
First Floor
Unit A
1080 sq.ft
Sold
Second Floor
Unit b
1080 sq.ft
Sold